Here is the start to Chris' rock rails. Everything is 3/16" steel and and all of the frame mounting points are gusseted. As this is a heavy truck, the gusseting was deemed necessary, especially since Chris is going to stress test these big time. Consideration was also given to the fact that Chris will at some point go to either a full or partial exo cage and the rails needed to be just far enough off the body line to attach future tubing. All the parts are built at this point and all it needs is to be welded to the frame.
The charcoal cannisters will have to be slightly relocated to accomodate the frame mount on that side and I will post pictures of what I did. This will be finished Tuesday and given a couple of coats of Dura Back lining.